Construction  of the fuselage was begun on 11/04/04. 

The left and right halves.  Once the right side is completed the left side is placed on top of the right and completed by pining the left side to the right.  This makes both sides exactly the same shape.

The horizontal stabilizer will fit into the slot in the plywood tail piece.

Detail of the stabilizer slot.

Now we're getting somewhere with the sides together on 11/12/04

The servo tray

Getting a little ahead of myself.

Almost ready to fly............

The hatch assembly

The cheek blocks

The pull-pull rigging for rudder and elevator

Fuel tank location

The pull-pull cable exits

The hatch in-place with pilot ready

 