11/12/05 - Started on the lower wings making the
I-beam spars
Splicing the ends of the upper wing spars which require
about 9" more than the 36" lower spars.
Finished (at least for now) the lower wings on 11/21/05
Started the upper right wing on 12/23/05. Finishing
the Aileron on 1/8/05 with nylon hinges
|